Edge Operations Managers

General Contracting, Custom Homes, Remodeling & Roofing · Greencastle, IN

Deer Creek Construction Co. LLC: Slashing Estimate Turnaround from Weeks to 1-2 Days (Replacing 40-Page Xactimate Bids with the Custom Pricing Worksheet & Splitting Roofing vs. Interior)

Owner
Chris & Christine Comer
Edge Operations Manager
Daniela Grimaldi
EdgeOS Progress
Full 9-Sprint EdgeOS Installation Completed (Sprints 1-9 - Graduated) (Workflow Processes, Playbooks, Role Library, Scorecards, Meeting Rhythm, Master Business Plan [MBP], Decision Making Compass, Internal Memo System, and Company Intelligence)
Tools Used
Monday.com, CompanyCam, Custom Pricing Worksheet, Zoho Books / QuickBooks, Adobe Sign, Claude, Grok Bot

01 · The "Before" Reality

The Tuesday-Morning Mess

Deer Creek Construction was growing rapidly - jumping from $789k in 2025 to $1.34M YTD and landing an $800,000 custom home build - but Christine Comer was wearing 10 hats at once, and Chris & Estimator Daryl had 16 estimates worth $3,000,000 sitting in a backlog with a 45-day average turnaround cycle. Why? Because they were trying to write every retail remodel and custom build inside Xactimate (producing confusing 40-page insurance-style line-item PDFs that homeowners couldn't understand), and Chris was returning from site visits with measurements in his head instead of uploading hand-drawn sketches to CompanyCam.

02 · Single Constraint Diagnosis

Primary Constraint Locked In

3-Part Growth Bottleneck: 1. 45-Day Estimate Turnaround & 16-Bid ($3M) Backlog: Writing complex 40-page Xactimate estimates for retail remodels was taking weeks, leaving 16 bids ($3M in potential revenue) sitting unsent while field inspectors failed to upload hand-drawn measurement sketches to CompanyCam. 2. $8,000 Margin Bleed on a $300,000 Remodel & Lost P&L Thumb Drive: Untracked garage inventory, unscheduled 2-hour crew hardware runs to Lowe's, and a Trojan virus that wiped out Christine's local thumb-drive P&L spreadsheet. 3. Uncollectible 6-Month Insurance Contingency Agreements: Homeowners were signing vague insurance contingency forms and walking away months later after Deer Creek had already invested dozens of hours working the claim.

Stop using Xactimate for retail construction bids and stop letting site visits end without a uploaded CompanyCam measurement sketch. Split fast roofing bids from complex interior remodels, use the Custom Pricing Worksheet to generate a homeowner-friendly proposal in 1-2 days, and have Operations Manager Daniela Grimaldi chase every missing sketch and pending proposal inside Monday.com.

03 · What Was Built in the Sprints

Specificity, Workflows & Playbooks

Mapped all core workflows (Sprint 1), built Monday.com CRM from scratch, authored 7 Execution Playbooks (Sprint 2), split estimating into two distinct tracks (Fast-Track Roofing Estimating vs. Interior Remodel Estimating), enforced mandatory hand-drawn on-site measurement sketches uploaded to CompanyCam/Google Drive, and replaced bloated 40-page Xactimate retail bids with a Custom Pricing Worksheet & Clean Retail Proposal Template - cutting estimate creation time from weeks down to 1-2 days and attacking the 16-bid ($3M) backlog.

04 · Real Rollout Friction & Course-Correction

How the System Held Up in Real Life

Across the 9 sprints, Daniela and the Comers hit - and solved - three gritty operational roadblocks: 1. The $8,000 Remodel Leakage & Trojan Virus: On a $300,000 remodel, Deer Creek lost $8,000 in margin because crews were grabbing untracked materials from the shop garage and taking unapproved 2-hour round trips to Lowe's mid-day; around the same time, a Trojan virus corrupted the USB thumb drive where Christine kept her manual P&L! Daniela responded by building the Material Ordering & Inventory Tracking Playbook and migrating financials into cloud-backed Zoho Books / QuickBooks and the Sprint 6 Master Business Plan (MBP). 2. Ditching Uncollectible Insurance Contingencies: After homeowners ghosted on 6-month-old insurance contingency agreements, Deer Creek eliminated contingency forms and switched to enforceable Fixed-Price Retail Contracts via Adobe Sign. 3. Bypassing Missed Synchronous Meetings with Automated 7:00 AM Briefs & The Internal Memo System: Because Chris and Christine were constantly pulled onto the $800k custom home site (as noted on the Scorecard: "Meeting rhythm is defined, the agenda is defined, the owner's schedule hasn't allowed these meetings"), Daniela built an Automated Daily 7:00 AM Morning Brief and Friday Weekly Wrap-Up powered by Claude / Grok Bot plus the Sprint 8 Internal Memo System - so Chris and Christine get exact pipeline, bid-backlog, and scorecard updates on their phones at 7:00 AM without needing a 1-hour sit-down meeting!

05 · Before vs. After Operational Shift

What changed in the work.

Operational DimensionBefore EdgeOSAfter EdgeOS Install
Owner InvolvementChristine wore 10 admin hats (and lost her P&L to a thumb-drive Trojan); Chris was buried under 16 backlogged bids ($3M pipeline) with a 45-day turnaround.Daniela runs Monday.com CRM, tracks all 7 Playbooks, manages the Internal Memo System, and delivers Automated 7:00 AM Daily & Friday Briefs.
Workflow Execution40-page Xactimate bids used for retail remodels; missing site measurements; $8k lost on a $300k remodel from 2-hr Lowe's runs; unenforceable insurance contingencies.Custom Pricing Worksheet & Retail Proposal Template (1-2 day estimate turnaround), mandatory CompanyCam hand-drawn sketches, Material Control Playbook, and Fixed-Price Retail Contracts.
Visibility & CadenceNo CRM; P&L on a local thumb drive; missed weekly meetings when owners were on job sites.Live Monday.com Pipeline, Department Scorecards, Master Business Plan (MBP), Decision Making Compass, and 7:00 AM Automated Briefs.

06 · In Their Own Words

"We started this company in March of 2012... and we landed an $800,000 new home build that's going to start in the next four to six weeks, plus we had sixteen bids totaling three million dollars backed up because writing forty-page Xactimate estimates for retail remodels was taking weeks... We replaced Xactimate on retail jobs with the Custom Pricing Worksheet so estimates take one to two days, switched from insurance contingencies to retail contracts, and set up the automated 7:00 AM daily brief and Internal Memo System."
Christine & Chris Comer (Owners, Deer Creek Construction) & Daniela Grimaldi (9-Sprint Reviews)